Work In Progress Limits: How to Stop Too Many Open Tasks From Slowing Delivery
Team Collaboration

Startups and fast-moving teams often find themselves buried under a mountain of open tasks, scattered across multiple tools and channels. The result is missed handoffs, lost clarity, and a growing sense of chaos that slows down delivery and employee fatigue, a common challenge as startups add more tools and processes to their stack.
In fact, workers now switch between nine apps per day, leading to feelings of overwhelm, and 56% feel pressured to respond to notifications immediately—fueling stress and reducing productivity (asana.com).
With a platform like Fluorine, startup teams can finally bring tasks and conversations together in one workspace, restoring order and focus. Work in progress limits are simple caps on how many tasks can be actively worked on at once, helping teams break the cycle of overload and deliver faster.
TL;DR / Key takeaways:
- Why overload happens in fast-growing teams—and how context switching slows delivery.
- How to set WIP limits per workflow stage and keep ownership clear in one workspace.
- A lightweight workflow to make limits visible, keep updates attached to tasks, and adjust over time.
- Common mistakes (like ignoring limits when things feel urgent) and how to avoid them.
- How to roll out new WIP norms with a short kickoff and team feedback.
This is for startup founders, operators, and small teams that are moving fast but feeling the drag of too many open tasks across chat and project tools. It’s a fit when you want clearer ownership and steadier delivery without adding heavy process.
Why Work in Progress Limits Become a Real Pain Point for Startup Teams
When startup teams are growing quickly, it’s easy for tasks to pile up in Slack, project boards, and sticky notes—making it hard to know who owns what or which priorities matter most. This scatter creates confusion, missed handoffs, and persistent delivery delays.
Constant context switching and cognitive overload can quickly slow even the most talented teams.
As productivity expert Francesco D'Alessio puts it, "Context switching is a huge loss for productivity day-to-day." Multitasking can reduce productivity by up to 40%, and each context switch can result in a 20% loss of cognitive capacity (early.app; reclaim.ai). When teams are overwhelmed with too many open tasks, valuable time is lost just trying to refocus—on average, it takes 23 minutes and 15 seconds to regain full concentration after an interruption (loom.com).
Project overload doesn’t just slow delivery—it increases psychological stress and makes it harder for teams to build new skills over time.
That’s why WIP limits for teams aren’t just a process tweak—they’re essential for startups that want to move quickly without burning out.
Fluorine’s flexible plans make it easy for startup teams to centralize their workflow, so WIP limits become a built-in part of daily work—not just another process to remember.
Core Principles for Setting and Adjusting WIP Limits in One Workspace
Ever wonder why some teams seem to finish projects with less stress and more predictability? The secret is applying a few simple principles around Kanban WIP limits and ownership—all inside a single workspace.
For teams blending Scrum and Kanban, hybrid models like Scrumban also leverage WIP limits to combine iterative development with continuous flow.
Here’s how high-performing teams do it:
- Make work visible: Use clear boards and channels so every task, owner, and status is easy to see.
- Set WIP limits per stage: Instead of just limiting the total number of tasks, apply limits to each workflow stage (for example, “In Progress: 3 items”). This gives teams more control and prevents bottlenecks before they start.
- Tie conversations to tasks: Keep all related comments, feedback, and decisions directly attached to the work, not buried in chat threads.
- Review and adjust regularly: After a few weeks, revisit your limits and tweak them based on team feedback and real throughput (atlassian.com).
- Encourage ownership: Make it clear who is responsible for moving each task forward, so nothing falls through the cracks.
“With Fluorine, teams can easily visualize and adjust WIP limits as their needs evolve—combining task management best practices with modern team communication in a single view.” (pricing)
A Simple Workflow for Work in Progress Limits That Fits Fast Teams
Here’s how to set WIP limits in a way that actually fits your startup’s pace—no long planning cycles required.
- Map your workflow: Create columns for each key stage (e.g., To Do, In Progress, Review, Done).
- Set clear WIP limits per stage: Start with a number that matches your team’s capacity—three tasks per person is a good rule of thumb.
- Create and assign tasks: Add new work directly to the board and make sure every task has an owner.
- Use comments and channels for updates: Keep discussions attached to tasks, not scattered across chat or email.
- Make the workflow visible to everyone: Use dashboards or boards so the whole team can see what’s moving and what’s blocked.
Regularly reviewing and adjusting WIP limits is widely recommended in Agile and Lean frameworks for keeping workflows optimized as team needs evolve.
Visual management tools, like those in Fluorine, make it easier for teams to see and respect WIP limits day to day.
For more on organizing tasks and communication, see Kanban vs List vs Calendar: Choosing the Right Task View for Startup Teams.
Case in point: When a tech startup introduced WIP limits, they cut project delivery time by 25% (aqmwagileinstitute.com).
How to Know Your WIP Limits Are Working
WIP limits only help if they change day-to-day behavior. A quick check is whether your board makes bottlenecks obvious (for example, items piling up in Review) and whether it’s easy to see who owns the next move.
If teams are still jumping between tasks, missing handoffs, or feeling constant notification pressure, your limits may be too loose—or your workflow stages may need to be clearer and more visible.
Common Mistakes with Work in Progress Limits and How to Avoid Them
Why do some teams set WIP limits but still end up overwhelmed? One common mistake is ignoring WIP limits when urgent requests arise—regular reviews help teams stay accountable.
It’s easy to overcomplicate your boards, set limits too high or low, or lose track of who’s responsible for keeping things tidy.
Sometimes, teams or managers resist WIP limits because they equate a busy board with productivity, when in reality, overload just hides workflow problems.
“Multitasking has the following research-proven disadvantages: Every task takes longer... The waste of time and attention for transfers among tasks” (Leach, 2014).
Visualizing your WIP trends over time can help surface patterns and prompt smarter adjustments.
Regular backlog grooming helps keep your WIP limits effective and your priorities clear.
Rolling Out Better Work in Progress Limits Norms with Your Team
Too many teams treat WIP limits as just another rule—when in reality, they’re a tool for making work more manageable and collaborative.
A short kickoff message and a quick working session can set the tone for a positive, team-driven rollout.
Creating psychological safety—where team members can share feedback about new norms without hesitation—will make your rollout more effective.
As AWS notes, “After a successful pilot phase, scale WIP limits, beginning with teams that regularly interact with your pilot team” (aws.amazon.com).
Benefits of limiting work in progress include fewer missed deadlines, less stress, and a more predictable delivery rhythm.
Teams adopting WIP limits alongside visual management report up to a 30% rise in stakeholder satisfaction.
Invite your team to try this approach inside Fluorine, starting with one project or team and adjusting as you learn what works best.
Frequently Asked Questions
What are work in progress limits (WIP limits)?
WIP limits for teams are agreed caps on how many tasks can be actively worked on at a time (either in total or within a specific workflow stage). The goal is to reduce overload so work moves through the system with fewer bottlenecks and missed handoffs.
Should we set WIP limits per person or per workflow stage?
Many teams start by setting limits per stage (like “In Progress” or “Review”) because it makes bottlenecks visible and easier to fix. For Kanban WIP limits, stage-based limits are a common approach, and you can still sanity-check them against capacity (like the “three tasks per person” rule of thumb mentioned above).
What do we do when urgent requests come in?
One of the most common failure points is ignoring limits as soon as something feels urgent. Instead, decide what work gets paused (or moved back) so the overall number of in-progress items stays realistic, then revisit the limit during your regular review to see if it needs adjustment.
How do we stop updates from getting lost in chat threads?
Keep discussions and decisions attached to the task wherever possible, then use channels for broader visibility rather than as the source of record. This makes it easier to see what’s blocked, what’s moving, and what still needs an owner.
References
- Asana. (2023). https://asana.com/resources/context-switching
- Early. (2023). https://early.app/blog/context-switching/
- Loom. (2023). https://www.loom.com/blog/cost-of-context-switching
- Reclaim.ai. (2023). https://reclaim.ai/blog/context-switching
- Leach, P. (2014). https://research.manchester.ac.uk/files/60831616/FULL_TEXT.PDF
- aqmwagileinstitute.com. (2025). https://aqmwagileinstitute.com/2025/01/17/setting-and-managing-work-in-progress-wip-limits